NAC459.95334. Annual fee.  


Latest version.
  •      1. Except as otherwise provided in NAC 459.953345 and 459.95335, the owner or operator of a facility that contains one or more processes and does not have an explosive manufacturing operation shall pay the fee required by subsections 1 and 2 of NRS 459.3824 before July 31 of each year.

         2. The amount of this annual fee for each facility will equal the sum of:

         (a) A base fee that is established pursuant to subsection 4; and

         (b) A graduated fee that is established pursuant to subsection 5.

         3. The total annual fee required by this section must not exceed $35,000 for a facility.

         4. The amount of the annual base fee that is authorized pursuant to subsection 1 of NRS 459.3824 is $5,600.

         5. The amount of the annual graduated fee that is authorized pursuant to subsection 2 of NRS 459.3824 is $39 per unit of highly hazardous substance at a facility. A unit of highly hazardous substance is equal to the total amount of the highly hazardous substance present at a facility, divided by the corresponding threshold quantity set forth in subsection 1 of NAC 459.9533 for that highly hazardous substance.

     (Added to NAC by Environmental Comm’n, eff. 7-6-92; A by R121-98, 5-27-99, eff. 6-21-99; R087-00, 7-27-2000; R087-00, 7-27-2000, eff. 7-1-2001; R137-04, 2-15-2005)