Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter461 Manufactured Buildings |
APPROVAL; FEES |
NAC461.210. Fees.
-
1. The Division will charge and collect fees for its services as follows:
For inspecting a plant.......................................
$750
For performing any other kind of inspection or service................................................
$75, or $37.50 per half hour or fraction thereof, whichever amount is greater.
For reviewing the plans for a model of factory-built housing, a manufactured building or a modular component.........................................
$100, or $50 per half hour or fraction thereof, whichever amount is greater.
For considering a system of construction for approval.............................................
$500
For issuing each insigne of approval for each module...............................................
$50
For replacing an insigne....................................
$50
For recording a change in the name of a manufacturer or owner......................
$50
2. In addition to the listed fee for performing an inspection, the Division will charge for each inspection the inspector’s:
(a) Actual expenses for travel;
(b) Salary; and
(c) Allowance for per diem.
3. The Division will not refund any fee it has collected unless:
(a) The Division has not incurred the expense for which the fee is charged; or
(b) A written request for a refund which is justifiable is submitted to the Division within 1 year after payment of the fee.
4. For the sale of copies of documents, the Division will charge and collect:
For each page of a copy...........................................
$0.25
For each copy of a regulation...................................
$5.00
[Mfd. Housing Div., Factory-built Housing Reg. § 28, eff. 8-6-82]—(NAC A 9-12-85; 8-23-95; R060-01, 10-30-2001; R052-03, 9-24-2003; R192-05, 9-18-2006)