NAC461.210. Fees.


Latest version.
  •      1. The Division will charge and collect fees for its services as follows:

    For inspecting a plant.......................................

    $750

    For performing any other kind of inspection or service................................................

    $75, or $37.50 per half hour or fraction thereof, whichever amount is greater.

    For reviewing the plans for a model of factory-built housing, a manufactured building or a modular component.........................................

    $100, or $50 per half hour or fraction thereof, whichever amount is greater.

    For considering a system of construction for approval.............................................

    $500

    For issuing each insigne of approval for each module...............................................

    $50

    For replacing an insigne....................................

    $50

    For recording a change in the name of a manufacturer or owner......................

    $50

         2. In addition to the listed fee for performing an inspection, the Division will charge for each inspection the inspector’s:

         (a) Actual expenses for travel;

         (b) Salary; and

         (c) Allowance for per diem.

         3. The Division will not refund any fee it has collected unless:

         (a) The Division has not incurred the expense for which the fee is charged; or

         (b) A written request for a refund which is justifiable is submitted to the Division within 1 year after payment of the fee.

         4. For the sale of copies of documents, the Division will charge and collect:

    For each page of a copy...........................................

    $0.25

    For each copy of a regulation...................................

    $5.00

     [Mfd. Housing Div., Factory-built Housing Reg. § 28, eff. 8-6-82]—(NAC A 9-12-85; 8-23-95; R060-01, 10-30-2001; R052-03, 9-24-2003; R192-05, 9-18-2006)