NAC535.260. Design and construction oversight by professional engineer; construction by licensed contractors.  


Latest version.
  •      1. A professional engineer shall provide design and construction oversight for any work on a dam for which the plans and specifications require the approval of the State Engineer pursuant to NRS 535.010.

         2. A contractor licensed pursuant to chapter 624 of NRS shall perform all construction on a dam classified as high hazard or significant hazard and on a large or medium dam classified as low hazard.

         3. A small dam classified as low hazard may be designed by empirical methods.

     (Added to NAC by St. Engineer by R124-02, eff. 5-30-2003)