NAC701A.190. “Significant change in the scope of the project” defined.  


Latest version.
  • “Significant change in the scope of the project” means:

         1. A change by more than 10 percent in the gross square footage of any building or other structure for which a partial tax abatement is sought;

         2. A change in the level of certification under the applicable LEED standard or Green Globes standard being sought if the change will affect the amount of the partial tax abatement being sought; or

         3. Any other change, including, without limitation, any change in the square footage or estimated costs of any building or other structure for which a partial tax abatement is sought, which will change the amount of the partial tax abatement being sought by more than 10 percent, except that changes resulting from increases in square footage, costs or any other factor affecting the amount of the partial tax abatement relating to the project as represented in the application therefor, including any amendments or disputed claims with a contractor or supplier relating to those costs, will not be considered a significant change in the scope of the project until they are reasonably final and known to the owner.

     (Added to NAC by Office of Energy by R116-07, eff. 12-4-2007; A by R127-13, 6-23-2014)