NAC704.966. Information regarding major facilities; consideration of options for major facilities.  


Latest version.
  •      1. Each informational report must contain a list of all its existing and planned major facilities for the supply of gas which it expects to be constructing, operating or utilizing in each gas year of the forecast period.

         2. Each informational report must contain information on the financial and economic characteristics of planned major facilities for the supply of gas. The information must include, without limitation:

         (a) The estimated costs of construction, purchases or acquisition of the rights to use the facilities;

         (b) The estimated costs of operation by gas year;

         (c) An assessment of the cost and reliability of its existing and planned major facilities for the supply of gas; and

         (d) The criteria used in determining the nature and extent of planned additions to major facilities for the supply of gas.

         3. A utility shall consider the following options for major facilities for the supply of gas:

         (a) The expansion of transmission facilities;

         (b) The augmentation of compressor stations;

         (c) The expansion and acquisition of storage facilities;

         (d) Interconnection with other pipelines;

         (e) Developing transportation arrangements; and

         (f) Improvements in the efficiency of major facilities for the supply of gas.

     (Added to NAC by Pub. Service Comm’n, eff. 4-18-90; A by Pub. Utilities Comm’n by R150-06, 3-23-2007)