NAC459.95341. Management system; implementation plan.  


Latest version.
  • The owner or operator of a facility with a process that is subject to C.A.P.P. shall develop:

         1. A management system to oversee the implementation of all program requirements and:

         (a) Assign a qualified person to have overall responsibility for the development, implementation and integration of the requirements of C.A.P.P.; or

         (b) Create a team with overall responsibility for the development, implementation and integration of the requirements of C.A.P.P. The owner or operator shall document:

              (1) The names of the persons who are members of the team; and

              (2) The relevant lines of authority for the team by means of an organization chart or similar document.

         2. An implementation plan that covers each element of the prevention program and each element of the emergency response program. The implementation plan must define how each requirement of each such element will be implemented at the facility and must provide a system that requires all information and documentation be controlled in a manner which ensures that the current information and documentation is in circulation and in use.

     (Added to NAC by Environmental Comm’n by R121-98, eff. 5-27-99; A by R137-04, 2-15-2005)—(Substituted in revision for NAC 459.95516)