NAC349.305. Initial review of application.  


Latest version.
  •      1. Upon the filing of an application, the required fee and, if applicable, a preliminary plan, the Director will review the material to determine if all information required on the application has been provided.

         2. Except for an application filed by a municipal obligor, the Director will promptly submit the application and all preliminary plans, permits, specifications and feasibility reports to the State Engineer for initial review and preparation of a report to the Board.

     (Added to NAC by Dep’t of Commerce, eff. 4-22-88; A 11-13-90; 7-6-92)