NAC445A.54032. Preparation by engineer of plans, specifications and design reports for facility.  


Latest version.
  • All initial and final plans, specifications and design reports for a facility to treat groundwater must be prepared by, or under the direct supervision of, an engineer. The engineer shall affix his or her signature, the applicable date and his or her wet seal or stamp to each sheet of those plans and to each title page for those specifications and design reports in accordance with NAC 625.610, 625.611 and 625.612.

     (Added to NAC by Environmental Comm’n by R126-05, eff. 10-31-2005)