Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter445A Water Controls |
UNDERGROUND INJECTION CONTROL |
Construction, Operation, Monitoring and Abandonment |
NAC445A.907. Power of Director to suspend or halt construction or operation.
Latest version.
- The Director may suspend or halt construction or operation of an injection well upon receipt of information that a contaminant which is present in or likely to enter a public water supply may present an imminent or substantial danger to the public health or safety.
(Added to NAC by Environmental Comm’n, eff. 7-22-87)—(Substituted in revision for NAC 445.4269)