Construction, Operation, Monitoring and Abandonment


NAC 445A.905. Construction prohibited without permit.
NAC 445A.906. Compliance with permit; minimization or correction of adverse impact on environment.
NAC 445A.907. Power of Director to suspend or halt construction or operation.
NAC 445A.908. Location and construction of well.
NAC 445A.909. Submission and contents of notice of completion; approval or denial of permission to initiate injection.
NAC 445A.910. Factors for determining logging and testing requirements for Class II wells.
NAC 445A.911. Limitations on location and pressure of injection; authorizing fracturing in zone for injection.
NAC 445A.912. Analysis of injected fluid.
NAC 445A.913. Frequency of monitoring.
NAC 445A.914. Placement of wells for monitoring Class III wells.
NAC 445A.915. Analysis of wells for monitoring Class III wells.
NAC 445A.916. Tests for mechanical integrity: Frequency.
NAC 445A.917. Tests for mechanical integrity: Methods for evaluating absence of leaks.
NAC 445A.918. Tests for mechanical integrity: Methods for determining absence of movement of fluid.
NAC 445A.919. Tests for mechanical integrity: Alternative methods.
NAC 445A.920. Loss of or failure to demonstrate mechanical integrity.
NAC 445A.921. Filing reports from monitoring and results of periodic tests.
NAC 445A.922. Retention of records from monitoring.
NAC 445A.923. Plugging and abandonment: Plan; notice; procedure; certification.
NAC 445A.924. When well is deemed abandoned.
NAC 445A.925. Plugging of well determined to be abandoned.