NAC455.130. Marking location of subsurface installation.  


Latest version.
  •      1. Except as otherwise provided in subsection 2 or when otherwise agreed to by an operator and an excavator, an operator marking the approximate location of a subsurface installation that has been located and identified pursuant to the provisions of NAC 455.125 shall mark the approximate location of the subsurface installation in a manner consistent with the marking practices in the industry.

         2. The requirement of marking the approximate location of a subsurface installation does not apply to an individual irrigation system for landscaping or to a playing field.

     (Added to NAC by Pub. Utilities Comm’n by R156-03, eff. 8-25-2004; A by R048-06, 9-18-2006)