Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter455 Excavations and Demolitions |
EXCAVATION OR DEMOLITION NEAR SUBSURFACE INSTALLATION |
NAC 455.105. Marking standards: Adoption by reference; availability. |
NAC 455.107. Marking standards: Controlling provisions. |
NAC 455.110. Notification of association for operators: Required information. |
NAC 455.115. Marking of proposed area of excavation or demolition; exemption from requirement for notification. |
NAC 455.120. Association for operators: Dissemination of information received in notification. |
NAC 455.125. Duties of operator upon receipt of notification from association for operators. |
NAC 455.130. Marking location of subsurface installation. |
NAC 455.135. Marks: Duties of excavator; re-marking; confirmation or replacement. |
NAC 455.140. Marks: Prohibited acts; removal upon completion of excavation or demolition. |
NAC 455.145. Restrictions upon and duties of excavator before commencement of excavation or demolition. |
NAC 455.150. Duties of excavator: Procedures for conducting excavation or demolition. |
NAC 455.155. Duties of excavator: Discovery of unmarked subsurface installation during course of excavation or demolition. |
NAC 455.160. Duties of excavator: Causing or observing damage to subsurface installation during excavation or demolition. |
NAC 455.163. Reporting of contact with, exposure of or damage to subsurface installation. |
NAC 455.165. Period for conducting excavation or demolition: Validity of notification; extension. |