  • Before an owner or operator of a facility:

         1. Commences the operation of a new process; or

         2. Brings any highly hazardous substances or explosives onto the site of the new process,

    Ê the owner or operator must obtain a permit to operate from the Division pursuant to NAC 459.953473.

     (Added to NAC by Environmental Comm’n by R041-01, eff. 10-25-2001; A by R137-04, 2-15-2005)